Click here to view current employment opportunities

Milestones

2008 - Zenocean launches “Funded Subsea Tie-Back” Model.

2007 - Zenocean returns to management hands.

2003 - Zenocean acquired by Monitor Oil Production

2002 - Zenocean secures Shell Bonga Design Verification contract from Global Energy of Nigeria.

2002 - Zenocean secures subsea services support contract with Venture Production.

2002 - Zenocean secures three-year plus options subsea support contract with BG Group.

2001 - Zenocean is contracted by BG Group to provide operability and intervention planning for West Delta Deep Development, offshore Egypt. A 650 metre water depth development tied back over 100km to shore.

2001 - Zenocean’s long term contract with Kerr-McGee is extended for three years.

2000 - Zenocean carries out first two projects in West Africa for Titan Projects and Shell Nigeria.

2000 - Zenocean is contracted by DNO Heather to carry out FEED study for Heather North Terrace subsea prospect.

1999 - Kerr-McGee and Oryx merger sees Zenocean’s two biggest clients come together. Zenocean now responsible for subsea issues relating to six major North Sea fields comprising eight production facilities and their attendent pipelines etc.

1998 - Oryx  assumes operatorship of the Ninian Field. Zenocean in turn assumes responsibility for subsea issues relating to the three Ninian platforms and all associated subsea pipelines and infrastructure.

1998 - Zenocean is contracted by Atlantic Power to provide subsea engineering and operations support for Banff FPSO.

1998 - Zenocean in partnership with Titan Projects of Calgary are contracted to carry out condition assessment of oil export pipeline in Arabian Gulf.

1998 - Zenocean is contracted by Talisman Energy to undertake preliminary feasibility study into relocation of Buchan A Floating Production Facility.

1998 - Zenocean is contracted by Reverse Engineering to carry out detailed conceptual design of Controlled Variable Buoyancy System for jacket decommissioning.

1997 - Zenocean secures long term contract with Atlantic Floating Production for pipeline integrity consultancy in relation to Texaco Galley Field pipelines.

1996 - Zenocean secures a long term subsea support contract with Kerr-McGee North Sea covering the operator’s Gryphon and Janice Fields.

1996- Zenocean moves to new purpose designed premises in Aberdeen city centre.

1995 - Zenocean secures first overseas contract from Balmoral Composites for analytical services on buoyancy system in Red Sea.

Dec. 1994 - Zenocean, in partnership with Atlantic Power, secures long term contract for subsea operations management from Oryx UK Energy Company covering their Hutton, Murchison and Lyell assets.