Zenocean can provide entire project capex and combine this with FEED, Design, procure, construct and installation of the Subsea Infrastructure, as well as maintaining the tieback and associated subsea infrastructure through-life. At end of field life undertake the required decommissioning. Payment via tariff starts upon production.

Applicable to

  • New Subsea Field Developments
  • Mature Field Infrastructure Refurbishment
  • Existing Field Expansion via Subsea Tie-Backs
  • ‘Stranded’ Production Solutions
  • Funding for Development Drilling

The Process

  • Develop Basis of Design in conjunction with operator
  • Screen options and select optimised minimum risk development plan
  • Develop Project Execution plan and agree with operator – technical solution
  • Agree commercial terms with operator for funded development
  • Zenocean responsible and accountable for execution/installation of the project – working closely with operator’s health, safety and environment group etc
Close
Go top